Thursday, September 11, 2025

İLGİLİ HABERLER

Factory Acceptance Completed in Konya OIZ Infrastructure Project

The factory acceptance process of our CTP (Glass Reinforced Polyester) pipes, which will be used in the 6th Phase Infrastructure Piping Project of the Konya Organized Industrial Zone, has been successfully completed at our Malatya facility. This process demonstrated that our products comply with the project specifications and meet international quality standards.

Our CTP pipes, with their corrosion resistance, high pressure strength, light weight, and long-lasting structure, are reliably preferred in modern infrastructure projects. Thanks to their low maintenance requirements, this technology offers both economical and sustainable solutions, making it a strong step forward in infrastructure engineering.

As in every part of our country, we continue to reflect the power of engineering on the field in Konya as well, building infrastructures that add value to the future.